Thursday, October 18, 2007

Hourglass Sweater and Yarn Diet

Well I finished the second sleeve and have now attached the sleeves and am working on the yoke. I think I may very well reach the current goal of finishing by the end of this month. But I have already passed so many target completion dates for this sweater, I don't want to get my hopes up. At least it is looking like a sweater now, instead of three tubes of stitches.

I do think that I will be massively breaking the yarn diet this weekend. But it depends on a few things.

Sunday, September 16, 2007

Shoulder Shawl and Sock Club

The shoulder shawl in Syrian lace pattern got the bulk of my knitting attention today. I would love to have it finished this month. But I would also like to finish the sweater this month.

I managed to avoid going to the yarn shop again today. Although I did get my first WoolGirl sock club shipment yesterday. However I don't think that can be considered breaking the yarn diet since that was already paid for and was a planned out purchase. it was not a late night sneaky shopping attack. Or somehow managing to drive to the yarn shop situation. The one good thing ( in terms of the yarn diet) is that none of the yarn shops in the area are technically on the way when I run errands. I've even avoided putting things in my shopping carts at all my favorite online stores. Even though I have been very tempted.

Saturday, September 15, 2007

Lace Shawl, socks, sweater

I have been working on the lace shawl and sweater steadily this past week. I made a mistake on the shawl and had to do some unknitting to fix it. But everything seems to be fine now.

The sleeve is going very slowly. It is going to take awhile. This may very well be the longest time I have taken to complete a project. I started the thing around March I think.

I started the heel flap on the Miss Babs socks. They are looking quite lovely. I should take pictures. I always say that though.

I was very strong today. I managed to talk myself out of going to the yarn store. I do have quite a bit of stash at the moment and should knit it down a bit. Although I do have trouble sticking to the Yarn Diet. I may very well buy yarn tomorrow or next weekend. It is so very tempting.

Tuesday, September 11, 2007

Miss Babs and Lace Shawl

I'm nearly finished with the leg of the first sock out of the Miss Babs yarn. I like the way the yarn is knitting up, but I like the pooling of hand dyed yarn on socks.


I worked a few rows of the Syrian lace shawl. I have some issues with the pattern though. I really just don't see how it is going to be big enough. I feel like I'm missing something, but so far it is not listed in any of the errata I have found for the book. We'll see, I guess. I would be very surprised if I managed to finish this thing before the end of the year.

I haven't touched the sweater since Sunday. Maybe I'll do a few rows of the sleeve tonight.

Monday, September 10, 2007

Miss Babs socks, Orange Socks, Blocking and Sweater

I finished the Orange socks last night. Now they just have to have the end woven in and be blocked. The Jitterbug socks have been blocked. The yarn dye ran a little more than I anticipated. I'm glad I washed them by hand instead of in the machine.

I started the Miss Babs socks in Chocolate Roses colorway. I'm only on the cuff but they are very pretty so far. I'm just doing a basic top down pattern.

The sweater also received a little attention and I got further along on the sleeves.